Introduction

Our company is a multi-disciplined organization equipped to undertake and execute any type of building or civil engineering construction program complete with all mechanical, electrical, and plumbing installations.
With licensed general contracting companies in USA (CGC 1511195), and Qatar, our company has an intimate knowledge of worldwide material and labor sources and through its many and diverse contacts and associations, also has the capacity to carry out projects of a specialist nature in joint agreement with other international organizations of repute.
The company is managed by professionals with many years of demonstrated experience in all facets of the construction industry. We are backed by a very large inventory of construction machinery, and a complete steel and wood fabrication workshop giving our group the skill, integrity and resources necessary to successfully execute any project.
We have earned our excellent reputation by delivering such notable projects of high caliber throughout the Middle East. Our past performance is extensive in the gulf which is exemplified with numerous awards and certificates of appreciation.
In the oncoming years working in Qatar we shall continue to demonstrate that Silver Falcon is the leading contractor, exceeding expectations and striving for excellence in any project we undertake.

Thank you.
Sincerely,

Toufic C. Simaan
Chief Executive Officer

 

Registration

   

 

Organization Chart

 

Equipment

Sl Name Nos
1. Crawler Excavators (22 Ton) 10
2. JCB Back Hoe 1
3. Compressors 2
4. Bus (Transporting vehicle) 5
5. Forklift (7 ton) 1
6. Concrete mixture machines 2
7. Transit mixture machines 1
8. Water tanks 1
10. Concrete vibrators 10
11. Steel cutters 2
12. Helicopter concrete leveling machine 3
13. Roller compactors 2
14. Diesel welding machine 1
15. Electric welding machine 2
16. Asphalt cutting machine 1
17. Pick up 3 Ton 1
18. Small vehicle 15
19. Elect. Generators 100kva 2
20. Elect. Generators 17kva 2
21. Rebar electrical Bending machine 2
22. Rebar electrical Cutting machine 2

 

List of Manpower

Sl Name Nos
1. Heavy Equip Operator 16
2. Driver 10
3. Concrete Steel Fixer 55
4. Concrete Carpenter 60
5. Mason 59
6. Painter 20
7. Wood Carpenter 30
8. Tiller 25
10. Tiller Helper 15
11. Plumber 15
12. Steel Fabricator 14
13. Steel Welder    10
14. Labor 140
15. Electrical 20
16. Mechanical 20

 

Ongoing Projects

Contract No. Description of Work Location Client Year start % Completed
8BOSQA009S Area 100 Ground Maintenance: Maintenance of grass, trees and platters for one year from April 2008 to April 2009 Camp AS Sayliyah Doha - Qatar ITT Industries 2010 42%
 
 
10 Excavators Yearly Hire Contract Ras Laffan Industrial City CCIC 2010 42%
  New Lebanese Embassy: Main Contractor, all Works Civil, Architectural and MEP Diplomatic Area Ministry of Foreign Affairs 2008 92%
W912D2-09-D-0004-0002 Removing CENTCOM: Demolishing and removing 4600m² of existing offices, 1114m of Chain Link Fence, and relocating 250 Concrete Barriers Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2010 95%
F38604-09-D-B002-5003 Lima Gate Sunshade: Supply and install of one 18mx15m and one 10mx15m PVC membrane Sunshade with precast concrete Jersey Barriers. Camp AL Udeid Doha - Qatar U.S. Air Force 2010 4%
W912D2-09-D-0004-0004 CMPC Smoke Detector System: Reprogramming the Fire Alarm to identify each smoke detector, installing 26 new pull stations, 5 new sound horns and 2 new smoke detectors in buildings 216 and 408. Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2010 2%
W912D2-09-D-0004-0006 PMO Mylar Tinting for Window: Supply and install of Security and Safety Film on the windows of 40 Villas Palm City Gardens Doha - Qatar U.S.Army ARCENT Qatar 2010 5%
W912D2-09-D-0004-0008 Underground Existing Tank Removal: Excavating and Removing existing Fuel Oil Storage Tank, Backfill and compact Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2010 1%
F38604-10-C-B011 Independence DFAC Repair: Supply and install of one Steel Door and 10 Wood Doors, one new PACU 25 Ton with ducting, and relocating the Salad bar with new drain, water and electrical sockets. Camp AL Udeid Doha - Qatar U.S. Air Force 2010 3%

 

Past Performance

Contract No. Description of Work Location Client Year start
  Bab Al Bahrain Buildings: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Khalifa bin Sulman Al Khalifa 1974
  Taqi Buchari Residential Buildings: Civil, Electro-mechanical and Finishing Works Bahrain Mr. Taqi Buchari 1975
  Bank of Bahrain & Kuwait Buildings: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Mohamed Bin Sulman AL Khalifa 1975
  Residential Buildings: Civil, Electro-mechanical and Finishing Works Jahral - Bahrain H.E. Sheikh Khalifa bin Sulman Al Khalifa 1976
  Sulmanieh Buildings: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Mohamed Bin Sulman AL Khalifa 1976
  SENA Residential Buildings: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Mohamed Bin Sulman AL Khalifa 1976
  Residential Buildings: Civil, Electro-mechanical and Finishing Works Abu Dhabi H.E. Sheikh  Tahnoon Bin Mohamed Al Nehyan 1976
  Residential Buildings: Civil, Electro-mechanical and Finishing Works Jahral - Bahrain H.E. Sheikh Mohamed bin Sulman Al Khalifa 1976
  Offices Building: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Khalifa Bin Sulman AL Khalifa 1977
  Traffic Headquarter Buildings: Civil, Electro-mechanical and Finishing Works Bahrain Traffic Department 1978
  Muharaq Market: Civil, Electro-mechanical Muharaq - Bahrain Municipality of Muharaq 1978
  Commercial & Residential Buildings (Candy Building): Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Khalifa Bin Sulman Al khalifa 1978
  Kuwait Hospital Phase II: Civil, Electro-mechanical Dubai Government of U.A.E. 1978
  Privet Palace: Civil, Electro-mechanical and Finishing Works with very High Quality Suningdale The Kieve U.K Toufic Simaan 1978
  International Hotel: Civil, Electro-mechanical and Finishing Works and Managing the Hotel for 10 years Abu Dhabi Toufic Simaan 1979
  Private Residence: Civil, Electro-mechanical and Finishing Works Lebanon Toufic Simaan 1979
  Gulf Air Tower: 10,000m², all Civil, Electro-mechanical and Finishing Works Diplomatic Zone – Hanada - Bahrain Al Khalifa

Gulf Air Tower

1979
  Palace : Civil, Electro-mechanical and Finishing Works Bahrain Mr. Mohamed Salah Al Din 1979
  Al Jazira Hotel: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Mohamed Bin Sulman AL Khalifa 1980
  Nursing Building: Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Mohamed Bin Sulman AL Khalifa 1980
  Residential Building: Two eight storey buildings; all Civil, Electro-mechanical and Finishing Works Bahrain H.E. Sheikh Khalifa bin Sulman Al Khalifa 1980
  Residential Building Compound: Civil, Electro-mechanical and Finishing Works Bahrain Mohamed Salahuddin Cons.  Eng. Bureau 1980
  Mosque: Civil, Electro-mechanical and Finishing Works Dubai Majed Al Futaim 1981
  Residential Buildings: Civil, Electro-mechanical and Finishing Works Abu Dhabi Mr. Darwich Bim Karam 1981
  Commercial Building: 15 floor residential and office building with a technical floor at roof, all Civil, Electro-mechanical and Finishing Works Cornich Area - Abu Dhabi GASCO 1982
  Residential Complex: Civil, Electro-mechanical and Finishing Works Al Khalidia - Abu Dhabi U.A.E Ministry of Foreign Affairs 1982
  Palace : Civil, Electro-mechanical and Finishing Works Abu Dhabi H.E. Sheikh Saif Bin Mohamed Al Nehyan 1982
  Residential Buildings: Civil, Electro-mechanical and Finishing Works Abu Dhabi Mr. Khaled Al Oteiba 1983
  Khaldyah Villas Compound: Civil, Electro-mechanical & Finishing Works Abu Dhabi H.E. Sheikh Saif Bin Mohamed Al Nehyan 1983
  3 Mosque: Jemaa Masjed 1200 worshipers, Amm 1A Masjed 300 worshipers and Amm 1B Masjed 300 worshipers; Civil, Electro-mechanical and Finishing Works Ruwais - Abu Dhabi ADNOC 1983
  Residential Compound: 57 Villas, all Civil, Electro-mechanical and Finishing Works Al Khalidia - Abu Dhabi H.E. Sheikh Saif Bin Mohamed Al Nehyan 1983
  Green Bird Buildings: Civil, Electro-mechanical and Finishing Works Abu Dhabi Mr. Joan Al Maxroyi 1984
  Residential Buildings: 9 storey building, Civil, Electro-mechanical and Finishing Works Abu Dhabi Mr. Hareb Al Darmaki 1985
  Al Oteiba Office Tower: Commercial tower all works; Civil, Electro-mechanical and Finishing Works Abu Dhabi Mr. Khaled Al Oteiba 1987
EC/521/1043 Supply and Provisioning Directorates building and Technical School: All Works, Civil, Architectural, Elect-mechanical and Road works. Sayed military City –  Swaihan – Abu Dhabi. G.H.Q. Armed Forces U.A.E 1988
  Privet Palace: 20,000m²  Civil, Electro-mechanical and Finishing Works with very High Quality Maryland USA Toufic Simaan 1988
DASA04-01-C-0005 Renovation of buildings 210 and 110 Camp Al Udeid Doha - Qatar U.S.Air Force ARCENT Qatar 2001
F38604-02-D-U0002 Modular Facility IDIQ Contract: 31 Ablution Units Camp Al Udeid Doha - Qatar U.S.Air Force ARCENT Qatar 2002
DASA04-02-C-0001 Ablution Units at buildings 410, 414 Camp Al Udeid Doha - Qatar U.S.Air Force ARCENT Qatar 2002
F38604-02-D-U0002 6 Units of Office Trailer Buildings Camp Al Udeid Doha - Qatar U.S.Air Force ARCENT Qatar 2002
DASA04-02-P0044 Construct Parking Lot 60.0 m x 90.0 m Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-C-007 Renovation of buildings 303, 302, 300 Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-C-008 872 Living Containers Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P-0027 Interior Works Bldg. 302:  Warehouse creation & Fire System. Renovation Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-C-0022 Interior Works Bldg. 215, 217: Offices creation & General Renovation Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DABM09-03-C-0003 Interior Works Bldg. Adm. Area 9000: Creation High Security  
Communication Floor
Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002-2003
DASA-04-02-P-0129 Frequency Converter Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P-0133 Security Fencing Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-D-0002-0003 Misc. Gravel Project Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-D-0002-0004 Misc. Gravel Project Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P0025 Supplied 31,000 pounds of special type III concrete Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P0033
Supplied 300,000 pounds of special type III concrete
Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P0041
Supplied 250,000 pounds of special type III concrete and  61,600 pounds of Matrix
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2002
DASA04-02-P-0042
Canvas Tents: Supply of 4 (25x11 m) Canvas Waterproof Tents with Interior Lighting, Air Conditioning and 2 Generators Camp AS Sayliyah Doha - Qatar U.S.Army ARCENT Qatar 2002
DASA04-02-P-0055
Transformer: Supply of 1250 KVA, 11,000 volt Transformer with HV Ring Main Unit
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2002
DASA04-02-C-0039
New Light Vehicle Wash Rack
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2002
DABM09-03-C-007
Latrine Buildings 414 & 410
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-P-0059
Security Fencing at Building 210
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-P-0090
Cable Tray Addition
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-P-0088
Concrete Pad
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DAMB09-03-P-0022
Supplied shipping containers
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-P-0061
Security Fencing: Supply & Installation of Fencing @ misc.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-C-0021
Activity Center: Multi Purpose Hall 703m² 1 floor Steel Structure Building
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-C-0016
Troop Medical Clinic: Multi Purpose Hall 400m² 1 floor Steel Structure Building
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DABM09-03-C-0017
Laundry, Latrines & Offices: 12 Steel structure Containers
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2003
DASA04-02-D-0002-0006
Misc. Paving II
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
DASA04-02-D-0002-0007
Misc. Paving for Bldg 213 Apron Extension
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
DASA04-02-D-0002-0010
Concrete Walkways Beside Maintenance Area
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
DASA04-02-D-0002-0012
Asphalt Parking near Activity Center
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
DASA04-02-D-0002-0013
Asphalt Parking 100 Area
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar
2004
DASA04-02-D-0002-0015
2000 meters of sidewalk ways
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
DASA04-02-D-0002-0016
Parking Area 200
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2004
4BOSQA-0111
Building 410: Installing a Temporary Water Line.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0124
Building 406, 106 and 109: Painting the interior wall 4102m² with aluminum Corner Angles.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0132
SOCCENT Area Potable Water Upgrade: Excavating 525m of trench and installing Water Lines and connecting them to the buildings.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0143
Supplying of Two Flag Poles with 10 Flags for Weather Control.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0144
Supplying and Installing 6 2.5 ton Split units with Concrete Pads.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0154
Excavating 300m Trench and installing 8” HP PVC Fire Hydrant Line with One Fire Hydrant Valve.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0155
Street Light: Excavating 1100m Trench and installing 37 Street Light Posts.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0163
Building 208: Constructing Two Concrete Pads and Two Sunshades and Shifting 7 Freezer with electrical Connections.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0197
Constructing 5000m of Jogging Trail with Grading and Supplying Sub-base and Compacting.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0206
SOCCENT Area: Painting 4 building Exterior Walls 315m².
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0213
Gate 9 and 9a: Constructing and Installing Two Turn Style Doors and Two Entry Doors with Access Push Button.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
4BOSQA-0220
Building 407: Constructing a Concrete Pad 16 x 15.2m with Epoxy Paint.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2004
5BOSQA-0029
Gate 1: Constructing 3 Camera Sunshades installed on Concrete Barriers.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0042
Power Plant: Sand Blasting and Heat Resistant Painting for Six Generator Stack, Shades, X-changers and Fuel Tanks.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0097
MVACIS Road: Constructing 78m long x 9m wide concrete Road and Steel Structural Sign Board.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0098
Power Plant: Supplying and installing One new Sump Pump.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0143
Excavating 750m Trench and Burying the existing Cable and Filling.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0175
Gate 9: Constructing a Steel Heavy Duty Rolling Door.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0213
Constructing 3 each 5.66x5.66m Concrete Pad and Constructing Steel Sunshade on each Pad.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
  Hamad Hospital : Painting Epoxy Parking area
Qatar
HBK Contracting 2004
  8 Villa Compound : Fabrication and Installation of Wood Doors
Qatar
Samerland Cont. 2004
  8 Villa Compound : Fabrication and Installation of Wood Skirting
Qatar
Samerland Cont. 2004
  HAWA BEIRUT Restaurant: Wood Decoration
Qatar
Al Khayarin Company Ltd. 2004
  4Pre-Fabricated Offices: Fabrication of 4x6x2.43mm Office Trailers
Qatar
Raytheon-Posco 2004
  4 Villa Compound : Fabrication and Installation of Wood Doors
Qatar
Samerland Cont. 2005
  4 Villa Compound : Fabrication and Installation of Wood Skirting
Qatar
Samerland Cont. 2005
W27P4B-05-R-0007
Dog Kennels: Design and Construct new 34 Dog Kennels building
International Zone, Baghdad - Iraq
U.S.Army MNFI Baghdad Contracting Office 2005
4BOSQA-0196
Fire Department : 4 Porta Cabins with Furniture
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
  Vellaggio : Sky Effect Painting – Base Coat
Qatar
LE Studio 2005
W27P4B-05-Q-0035
Repair Drop Ceiling: Repairing of Drop Ceiling in Various Buildings
FOB, Cuervo Rustamaya- Iraq
U.S.Army MNFI Baghdad 2005
5BOSQA-0201
Building 412: Electrical upgrades
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
4BOSQA-0197
Block Power Survey: Surveying the electrical Cables under ground and buildings and Transformers panel Labeling
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0239
Building 9016 Oasis : Extra Lights and Fire upgrades and Kitchen Hood with Fire Suppression system
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0240
Lift Arm Gate: Installation of Lift Arm Gate in Camp AS Sayliyah
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0246
Relocate AMC AC Unit: Relocating AC unit with new Duct with electrical connection
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0302
Sunshades JLSC: 3 Fabric Mesh Sunshades in different Locations
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0320
Power Plant: Constructing Side walkway, 3 new External Steel Doors and Interior Painting.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0329
Building 111: Constructing new Drywalls and 3 new Wood doors.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0331
Building 124: Constructing one new Drywall with new Steel Door
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0339
Maintenance Shed: Fabricating and Installing 15.2mx7m Steel Sunshade
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA0326
Building 101: Roof Repairs and Spraying Polyurethane Foam and Waterproof Paint.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA0351
Building 303: Constructing Side walkway, Sunshade and concrete Pad, New bathroom with Cubicle partitions.
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA0295
TMP Building: 40ft x 22ft Port a Cabin with partition and AC and a Bathroom
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA0362
Area 100 Ground Maintenance: Maintenance of grass, trees and platters for one year
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005-2006
5BOSQA-0327
Building 103: Constructing Two Kitchen Hood with Fire System and Sewage Repairs
Camp AS Sayliyah Doha - Qatar
ITT Industries 2005
5BOSQA-0350
Building 213 : Constructing a Concrete Pad, Supplying of new ATS 600A and Connecting to Existing Building, Transformer and Building
Camp AS Sayliyah Doha
ITT Industries 2005
5BOSQA-0354
Building 111: Roof Repairs and Spraying Polyurethane Foam and Waterproof Paint
Camp AS Sayliyah Doha
ITT Industries 2005
5BOSQA0338
Building 200B: Extension of 4 new Dog Kennels and a new room as a Clinic for Dogs all Works (concrete floor, walls, Painting, Electrical, Plumbing etc…)
Camp AS Sayliyah Doha
ITT Industries 2005
5BOSQA0409
Building 112: Interior repairs (Painting, new Carpet, Door Knobs and Smoke Detector).
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0022
Building 307 Restroom: Installing new Drywall, Painting and Tiling.
Camp AS Sayliyah Doha
ITT Industries 2006
5BOSQA0358
Building 311 Sunshades: Two Sunshades 30m x 18m and 21m x 18m with Waterproof Lights and Outlets.
Camp AS Sayliyah Doha
ITT Industries 2006
5BOSQA0361
Miniature Golf Course: 9 hole Golf Course and two water pools all works (excavation, concrete, rubble walls, artificial grass, flags, street lights, solar lights, and solar fountains).
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0025
Relocate of TMP: Removing and reinstalling two Roll-up doors, power Ventilator and Light fixture in new building.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0026
PHA Relocation: Installation of GFE Fence Fabric and two Fence Gates in new location with new Posts for Fence and Gates.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0040
Building 406: Opening passage way in CMU wall, installing new Dry wall with Paint, relocating existing door and relocating existing fence.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0035
MVACIS Fence: Installing GFM 124m Fence on concrete floor with new Posts for Fence and Gate.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0037
Building 406 Lounge: Constructing 12x6m Concrete Pad, Installing GFM Sunshade Installing CMU Wall, Painting and 3 new Outdoor Lights.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0035
Building 208 Electrical Update: Supply and install 280m 4c x 95mm² Cable underground and New 12 way Panel Boards with new Power outlets.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0081
Fencing Stryker Work Area: Supplying and installing 140m long of 9 gauge PVC coated 7 ft high Fence with 3 each 9m wide double swing Gates and Leveling the area around 3311m².
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0067
North Wall: Removing of 18 street lights and supplying and installing new 23 double sided arm brackets with new 400W light fixtures
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0077
Property Modular Building: Fabricating steel structure Port a Cabin 40 ft x 22 ft wide with Rollup door and electrical outlets and supply of Refrigerator and 3 Microwaves
Camp AS Sayliyah Doha
ITT Industries 2006
W27P4C-M-05-1924
Baghdad Repairing Roads: Pouring of 850m³ Concrete in the holes of the Road
Camp Victory- Iraq
U.S.Army Victory Contracting Office Baghdad 2006
6BOSQA0097
Fence Upgrade Area 100: Supple and Installing 1460m New Aircraft Cable, Tension Wires and Bottom Rails.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0094
Building 418 Latrine: Breaking the outside wall 80m long and building new CMU wall with construction joints and Tiling, Painting and 4 new single steel doors and 1 new double steel door.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0114
Building 207 Fire Safety Wall: Constructing a 14.3m Long x 5.25m high with a new 3 hour Fireproof Steel Door and sealing with special fireproof caulks.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0106
Building 414 Latrine: Breaking the outside wall 80m long and building new CMU wall with construction joints and Tiling, Painting and 4 new single steel doors and 1 new double steel door.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0104
Building 106: Constructing a new Drywall room with wood door and a new steel door.
Camp AS Sayliyah Doha
ITT Industries 2006
IJO 6053
Building 416 Latrine: Breaking the outside wall 80m long and building new CMU wall with construction joints and Tiling, Painting and 4 new single steel doors and 1 new double steel door.
Camp AS Sayliyah Doha
Venture Gulf Group 2006
PO 73
Building 408 New Latrine: Supply and installation of Electrical, HVAC and Plumbing works with Fixtures.
Camp AS Sayliyah Doha
Allied Arms 2006
6BOSQA0153
Gate 9A & 9E: Installing a Transaction Drawer at Gate 9A and Removing and reinstalling Aluminum Window and two new Flood Lights.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0105
Building 410 Latrine: Breaking parts of the outside wall 80m long and building new CMU wall with construction joints and Tiling, Painting and 4 new single steel doors and 1 new double steel door.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0098
Driving Range: Fabricating a Driving Range for Practicing Golf size of 118’ x 42.5’  x 15’ to 35’ high covered with Heavy Duty nets made in USA with two hexagonal Sunshades, and installing 7 street Lights and Two 1m Fence Gates.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0076
Building 110: Fabricating and installing 145m 14’ high Fence with two 20’ x 10’  long sliding gate and two 13’ x 14’ high sliding gate, and purchasing and assembling shelving for Pallet Racks made in USA.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0149
Building 110: Constructing double Stud and Sound Insulated Room with two Wood Doors and a one new Double Steel Door for SSSC room.
Camp AS Sayliyah Doha
ITT Industries 2006
6BOSQA0167
Petrol Station: Removing the old Steel Roofed Sunshade and Constructing and installing a new Fabric Sunshade 7.50m x 6.00m.
Camp AS Sayliyah Doha
ITT Industries 2006
W912D2-06-C-0019
Connex and Concrete Tables: Fabricating an Office for FedEx with roll-up door, window, AC, Desk, Chair. Supplying of 12 Concrete Tables and 48 quarter circle concrete Benches
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2006
W912D2-06-P-0090
Privacy Slats: Supplying and Installing 88 meter of Privacy Slats with PVT locks at north side of building 216.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2006
5BOSQA0362
Area 100 Ground Maintenance: Maintenance of grass, trees and platters for one year
Camp AS Sayliyah Doha - Qatar
ITT Industries 2006-2007
6BOSQA0140
Building 221: Supplying and Installing 48 each Low Bay 400 W Ceiling Light Fixtures with wiring and new 3x30 amp Breaker, 8 each Wall mounted 1500 W Flood Lights with cable and Photocell and 4 each 10 m high Street Light Poles, 8 each Sport Flood Lights 1500 W two on each Pole with Cables and new 3x45 amp Breaker.
Camp AS Sayliyah Doha
ITT Industries 2007
6BOSQA0152
Building 104: Breaking the wall and making a door way, building new CMU wall and plastering and Painting Stucco, Installing the GFE Revolving Security Access Door with all the Electrical, Fire and Data wiring.
Camp AS Sayliyah Doha
ITT Industries 2007
W912D2-06-C-0017
Modular Processing Building: 40 ft x 22 ft Modular building with very heavy and high quality Steel Structure with 3 AC Split type units, Electrical, Wood doors, Aluminum Windows, NIPR and Telephone Outlets connected to a Hub, 7 each Workstation Furniture with Modular Partitions and 2 Steel Structure Stair Cases.
Camp AS Sayliyah Doha
U.S.Army ARCENT Qatar 2007
6BOSQA0148
North Area Parking Lot: 4200 meter square of Asphalt Parking, Excavating, providing and filling Sub-base and Asphalting 90mm Bituminous Asphalt.
Camp AS Sayliyah Doha
ITT Industries 2007
W912D2-06-C-0008
AFEES Reconfigure: Breaking walls, Constructing New CMU walls and Dry Walls, supply and install 10 new Steel Doors, supply and install 4 new 25 ton HVAC units with ducting and diffusers, Removing light and installing in the new location with new 39 new lights, Tell, Com lines, painting the outside and inside walls, Epoxy painting the floor, Excavating outside and installing utilities, Asphalting the front yard and relocating the modular buildings and reconnecting to the Utilities, Relocating the existing sunshade and fabricating and installing a new 18 x 12m Sunshade.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-06-P-0149
Living Quarters: 2 x 40 ft x 10 ft Modular building (two living rooms and a bathroom in middle) with very heavy and high quality Steel Structure with Sandwich Panel Roof and Wall with 2 AC Window type units, Electrical, Steel doors, Aluminum Windows, NIPR and Telephone Outlets 2 Steel Structure Stair Cases.
Camp Arifjan Kuwait
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0001
25th Signal Battalion Parking Lot: 1270 meter square of Asphalt Parking, Excavating, providing and filling 100mm high Sub-base and Asphalting 100mm Bituminous Asphalt of Two Layers
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0002
Power to JEOD: Connecting the Isolator to the GFE Communication Shelter’s Panel, Grounding the Communication Shelter and the Satellite Base, Supplying and installing 10 each European style 16Amp power Receptacles and installing GFE ECUs.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0003
TMC Built : Constructing Four new Drywall Offices and Closets with Painting and Vinyl Base Molding, Communication outlets, Smoke Detector, shifting the Sprinkler Heads and AC Ducts and Shelving in the Closets
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0004
DFAC Stair Case : Fabricating 6 each Steel Staircase with Painting
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0005
North Parking Lot Sunshade: Excavating and pouring 18 number of Concrete Foundation and installing the government provided 2 sunshades.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0006
Building 421 Break Room: constructing a new drywall room with electrical , two aluminum windows, one split AC.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0007
Building 218: Constructing three new Drywalls, painting and supplying and installing 7 new Steel Doors.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
W912D2-07-D-0002-0008
Sunshade Gate 11: Constructing new Steel Structural Sunshade size 5790mm x 7315mm x 6000mm high with excavation and concrete foundation.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
  Honeywell USA: Excavating and backfilling trench, concrete foundation for cameras, hiring electricians, and helpers
Camp AS Sayliyah Doha - Qatar
Venture Gulf 2007
  Scanner Steel Brackets: Fabrication and Installation Steel brackets
Camp AS Sayliyah Doha - Qatar
MEBS 2007
  Civil works: Excavation and constructing foundations and installing bollard and posts for camera
Camp AS Sayliyah Doha - Qatar
MEBS 2007
  Equipment: Hiring Boom lifts and Scissor lifts with operators
Camp AS Sayliyah Doha - Qatar
MEBS 2007
  Manpower: Hiring Electrician, Labor and Supervisor
Camp AS Sayliyah Doha - Qatar
MEBS 2007
W912D2-07-D-0002-0009
Helicopter Pad: Excavating 6 holes for lights, engraving the existing concrete pad and painting reflected paint letter H size of 12m x 10m and supplying 8 each Helicopter landing lights (imported from USA).
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2007
 
 
 
 
10 Excavators Yearly Hire Contract
Ras Laffan Industrial City
CCIC 2006-2007
 
 
 
 
Carrefour III Tiling and Screed Works
Landmark Mall
MAF Hypermarkets 2007
 
 
 
Carrefour III Fit out Works
Landmark Mall
MAF Hypermarkets 2007-2008
5BOSQA0362
Area 100 Ground Maintenance: Maintenance of grass, trees and platters for Six Months
Camp AS Sayliyah Doha - Qatar
ITT Industries 2007-2008
 
 
 
 
10 Excavators Yearly Hire Contract
Ras Laffan Industrial City
CCIC 2007-2008
W912D2-07-D-0002-0011
Steel Sunshade: Fabrication and installation of 4 Steel Structure and Fabric Sunshades size of each 5m x 4.25m.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0013
Combined Marital Quarters: Combining 2 living containers together with opening 3m wide with wood frame.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-08-P-0020
CCTV Building 213: Installation only of 8 cameras with all wires and conduits with configuring the system.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
S.029.02.2008-R1
Construction Work: Supplying and Installing Double Block wall with plaster and Paint, One Wood Door and One Steel Door.
Al Jazeera Sport Channel –  Studio 4
Al Jazeera Channel 2008
W912D2-07-D-0002-0012
Security Cage: Fabrication and installation of Security Cage 16m long with 4mm expansion metal and frames with one door and supplying and installing one 3m x 4m high Aluminum rollup door.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0014
Water Tower Fence: Supply and install of 245m long of GI Chain link Fence, 2 x 4.9m Fence Gate and 1 x .92m Fence Gate
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0015
Ablution Unit: Repairing an existing old Ablution unit with changing the floor, painting the wall, removing the showers and new sanitary wares and relocating on new constructed concrete footing with utility connections.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0016
Revamping BDOC: Removing existing Partition, floor carpet, Painting all the walls, supplying and installing new carpet, electrical NIPR SIPR outlets and shifting the security equipment from building 102 to Building 101.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0017
Repairing existing Rollup Doors: Supply and install two steel sheet 3.5m x 3m high manual operated Rollup doors, one Steel insulated 4.4m x 5.6m high and one 4.72 x 4m high with motor electrically operated Rollup Doors
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
 
 
 
Decoration of Showroom Street 45
Industrial Area
Al Daicel 2008
W912D2-07-D-0002-0018
Relocating Thermostat: Supply and install three new thermostat and connect to HVAC units and connect the HVAC units to FACP
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar
2008
W912D2-07-D-0002-0019
JEOD Temporary Building: Excavation and constructing 8 concrete Foundation and trench 28m with electrical Cable and Grounding.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0020
IT Tower Relocation: Removing existing Fence, Generator, Steel Sunshade, Port a cabin and transport from Tell yard to Camp As Sayliyah; and Dismantle communication Tower 24 meter high and transport and reinstall at Camp Falcon 78.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
 
 
 
 
Excavation of Trench with Road Crossings 
Ban Hajir, Shaniya, Airport, Mesieed
Telvent-Nass 2007
  CMU Project: Installing of 340m² of Floor Tiles, 3854m² of External Wall Tiles Mechanical Type and 946m² Gypsum Board Walls
Qatar Foundation
CCIC 2008
W912D2-07-D-0002-0021
HVAC building 214: Supply and install one 18ton HVAC unit with Ducting and three Exhaust fans with Ducting.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0023
Server Room: supply and install 5 2.5 ton Split Units.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0025
Duct Cleaning: Cleaning the 14 PACU Ducting system and supply and replace 200 flexible ducts.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
  Installing Tiles: 1160m²  of Stair Steps, 400m² Landing  and 400ml Skirting
SARA TOWER  Al Dafna Area Doha - Qatar
SEG 2008
  Installing Tiles: 1608m²  of Floor Tiles, 189ml Skirting, 375m² Stone cladding by mechanical fixation, 330m² Chiseling and grouting of lift walls and 300m²  of Cladding with Adhesive
ALI BIN ALI SHOWROOM    Al Dafna Area Doha - Qatar
SEG 2008
  Polishing Tiles: 425m²  of Lift wall Tiles and 540ml Grooves + grout
NAVIGATION TOWER              Al Dafna Area Doha - Qatar
SEG 2008
  Grinding and Polishing: 2097m²  Floor Tiles and Skirting ALI BIN ALI SHOWROOM    Al Dafna Area Doha - Qatar SEG 2008
  Installing Tiles: 56m² of  Stair landing, 116ml Stair steps, 186ml Curved stair steps, 150ml Coping Stone, 230m² 10x10cm Circle floor tiles and 915m² landscaping wall tiles ALI BIN ALI SHOWROOM    Al Dafna Area Doha - Qatar SEG 2008
W912D2-07-D-0002-0022
Dog Kennel Expansion: Fabrication and installation with concrete foundations of 12x8.4m Port a cabin and expanding two new dog kennel with block wall and paint and concrete flooring with electrical and five new split AC units.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0028
JTID Antenna Bldg. 303: Constructing 4 footings and installing GFE 15m high Antenna with guy wires & earth system.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
  Polishing 2000m² of Stone Cladding
AL DAR HOTEL   Doha - Qatar
Al Mayassa 2009
  Installing 1600m² Stone Cladding for Lift Wall and Exterior Wall
CLASSIC HOTEL   Doha - Qatar
Al Mayassa 2009
  Installing Tiles: 3000m² of Landscaping Tegula, 1500ml of Strips 2x15cm, 500ml of Strips 10x30cm, 1000lm of Strips 15x30cm, 1500ml of Coping 30x30, 770m² of 10x10cm Circle floor tiles, 500m² Ceramic floor tiles, 650m² Granite water feature tiles 50x30x30cm,  30x30cm, 45x45cm with polish, sand plaster, 500ml Boundaries Granite tiles 30x30x100cm and 100m² Ceramic Tiles 2x2cm ALI BIN ALI SHOWROOM    Al Dafna Area Doha - Qatar SEG 2009
W912D2-07-D-0002-0029
Replacing Carpet: Removing the old and installing new carpet 70m² with wood skirting.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0024
Guar Booths: Constructing 3 new Concrete slabs and installing 4 GFE Guard Booths with connections.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0026
Security Upgrade CMPC: Supply and install 3 single and 1 double STC 45 Steel Doors with security hardware and gypsum walls.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2008
W912D2-07-D-0002-0030
Renovation building 307: Painting walls, doors, new Vinyl Flooring, Repairing and fixing new False Ceiling, Repairing and replacing lights, Repairing and replacing toilet tiles, equipment, Cleaning Carpet, Extending Sprinkler System, and New Exhaust Fan and Ducting.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0034
Gate 10 Guar Shack: One new Window AC unit and connecting power to the new guard booth.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0031
Replacing Lights: removing and replacing government furnished high bay light fixtures for 6 warehouses total of 640 lights.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0033
MOGAS Fence: Supply and Install 196m Chain Link Fence and 2 new 8.0m Fence Gate
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0043
CAC AV Upgrade for Chaplin: Supply and Install DJ booth made of wood, install GFE projectors and connections
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0044
Building 102 Room 4, Replace Carpet and AC: Supply and Install 90m² Carpet Tiles and 2 new Split AC with electrical connections
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0045
Working Area for IDS & CCTV: Supply and Install Wood Shelves and Desk and 1 split AC unit with electrical connections
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0046
Medlog VSAT Installation: Supply and construct 4.26 x 4.26m concrete pad
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0040
Installation of 2 Canopies in Break Area: Supply, fabricate and Install 2 each 5.5 x 5.5m Sunshades, including excavation, concrete, etc…
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0041
Wash Rack Vacuum: Supply and Install 2 Vacuum cleaning machines
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0032
Add AC Building 107: Supply and Install a new 20 Top Roof Top PACU with ducting, Steel Structural supports to carry the Unit and one Split AC unit
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0034
DOL Painting: Painting walls, Doors, Skirting and Stair Rails
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0036
CASMAC Fence: Install 231m Chain Link Fence and 5 new 6.0m Fence Gates
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0037
Remove Kevlar: Supply and Install 90m² Gypsum wall, 2 Aluminum Windows, 2 Wood Doors, 1 Steel Door, 1 Bullet proof Window , 2 interview window, 2 Split Unit, Lighting, CCTV, and Communication
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0039
JPOTF Carpet & Door Installation: Supply and Install 138m² Carpet Tiles and replace two wood doors with two new Steel Doors
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
W912D2-07-D-0002-0038
JPOTF Fence Mesh: Supply and Install 966m² mesh over the existing Fence
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2009
F38604-09-D-B002-5001
PRESCO Sunshade: Supply and install of 20mx11m PVC membrane Sunshade with concrete pad under it and supply and install of 12 precast concrete Benches
Camp AL Udeid Doha - Qatar
U.S. Air Force 2009
8BOSQA009S
Area 100 Ground Maintenance: Maintenance of grass, trees and platters for Six Months
Camp AS Sayliyah Doha - Qatar
ITT Industries 2009
 

 
 
 
10 Excavators Yearly Hire Contract
Ras Laffan Industrial City
CCIC 2009
W912D2-07-D-0002-0042
Burn Pit: Supply and Install 20m chain link Fence, construct 3220 x 3220 x 150mm and a Burn Pit
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
W912D2-09-D-0004-0001
ADA Blast Wall: Supply and install 18 Alaska Barriers and filling Soil behind them.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
F38604-09-C-B004
Relocate Sprung Shelter: Dismantle and reinstall 3 45.7 x 18.4 Steel Structural Sprung Shelter.
Camp Al Udied Doha - Qatar
U.S.Air Force 2010
W912D2-09-P-0063
AC Units: Supply and deliver of 23 AC units
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
W912D2-09-D-0004-0003
Main Power Plant: Removing the existing insulation below the steel Roof and installing a new insulation with SS mesh.
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
W912D2-09-D-0004-0005
Storage Area: Install new Drywall, one Wood Door, two small wood Platforms, Painting all walls and skirting in building 109
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
W912D2-09-D-0004-0007
Basketball Surface Removal: Removing of the rubber flooring of Basketball court
Camp AS Sayliyah Doha - Qatar
U.S.Army ARCENT Qatar 2010
Home | History | Awards | Profile | Portfolio | Careers | Contact © Copyright 2022 Silver Falcon Contracting & Trading Co. W.L.L.