Bab Al Bahrain Buildings:
Civil, Electro-mechanical and Finishing Works |
Bahrain |
H.E. Sheikh Khalifa bin Sulman
Al Khalifa |
1974 |
|
Taqi Buchari Residential Buildings:
Civil, Electro-mechanical and Finishing Works |
Bahrain |
Mr. Taqi Buchari |
1975 |
|
Bank of Bahrain & Kuwait
Buildings: Civil, Electro-mechanical and Finishing Works |
Bahrain |
H.E. Sheikh Mohamed Bin Sulman
AL Khalifa |
1975 |
|
Residential Buildings: Civil,
Electro-mechanical and Finishing Works |
Jahral - Bahrain |
H.E. Sheikh Khalifa bin Sulman
Al Khalifa |
1976 |
|
Sulmanieh Buildings: Civil,
Electro-mechanical and Finishing Works |
Bahrain |
H.E. Sheikh Mohamed Bin Sulman
AL Khalifa |
1976 |
|
SENA Residential Buildings:
Civil, Electro-mechanical and Finishing Works |
Bahrain |
H.E. Sheikh Mohamed Bin Sulman
AL Khalifa |
1976 |
|
Residential Buildings: Civil,
Electro-mechanical and Finishing Works |
Abu Dhabi |
H.E. Sheikh Tahnoon
Bin Mohamed Al Nehyan |
1976 |
|
Residential Buildings: Civil,
Electro-mechanical and Finishing Works |
Jahral - Bahrain |
H.E. Sheikh Mohamed bin Sulman
Al Khalifa |
1976 |
|
Offices Building: Civil, Electro-mechanical
and Finishing Works |
Bahrain |
H.E. Sheikh Khalifa Bin Sulman
AL Khalifa |
1977 |
|
Traffic Headquarter Buildings:
Civil, Electro-mechanical and Finishing Works |
Bahrain |
Traffic Department |
1978 |
|
Muharaq Market: Civil, Electro-mechanical |
Muharaq - Bahrain |
Municipality of Muharaq |
1978 |
|
Commercial & Residential
Buildings (Candy Building): Civil, Electro-mechanical and Finishing
Works |
Bahrain |
H.E. Sheikh Khalifa Bin Sulman
Al khalifa |
1978 |
|
Kuwait Hospital Phase II:
Civil, Electro-mechanical |
Dubai |
Government of U.A.E. |
1978 |
|
Privet Palace: Civil, Electro-mechanical
and Finishing Works with very High Quality |
Suningdale The Kieve U.K |
Toufic Simaan |
1978 |
|
International Hotel: Civil,
Electro-mechanical and Finishing Works and Managing the Hotel for 10
years |
Abu Dhabi |
Toufic Simaan |
1979 |
|
Private Residence: Civil,
Electro-mechanical and Finishing Works |
Lebanon |
Toufic Simaan |
1979 |
|
Gulf Air Tower: 10,000m²,
all Civil, Electro-mechanical and Finishing Works |
Diplomatic Zone – Hanada
- Bahrain |
Al Khalifa
Gulf Air Tower |
1979 |
|
Palace : Civil, Electro-mechanical
and Finishing Works |
Bahrain |
Mr. Mohamed Salah Al Din |
1979 |
|
Al Jazira Hotel: Civil, Electro-mechanical
and Finishing Works |
Bahrain |
H.E. Sheikh Mohamed Bin Sulman
AL Khalifa |
1980 |
|
Nursing Building: Civil, Electro-mechanical
and Finishing Works |
Bahrain |
H.E. Sheikh Mohamed Bin Sulman
AL Khalifa |
1980 |
|
Residential Building: Two
eight storey buildings; all Civil, Electro-mechanical and Finishing
Works |
Bahrain |
H.E. Sheikh Khalifa bin Sulman
Al Khalifa |
1980 |
|
Residential Building Compound:
Civil, Electro-mechanical and Finishing Works |
Bahrain |
Mohamed Salahuddin Cons.
Eng. Bureau |
1980 |
|
Mosque: Civil, Electro-mechanical
and Finishing Works |
Dubai |
Majed Al Futaim |
1981 |
|
Residential Buildings: Civil,
Electro-mechanical and Finishing Works |
Abu Dhabi |
Mr. Darwich Bim Karam |
1981 |
|
Commercial Building: 15 floor
residential and office building with a technical floor at roof, all
Civil, Electro-mechanical and Finishing Works |
Cornich Area - Abu Dhabi |
GASCO |
1982 |
|
Residential Complex: Civil,
Electro-mechanical and Finishing Works |
Al Khalidia - Abu Dhabi |
U.A.E Ministry of Foreign
Affairs |
1982 |
|
Palace : Civil, Electro-mechanical
and Finishing Works |
Abu Dhabi |
H.E. Sheikh Saif Bin Mohamed
Al Nehyan |
1982 |
|
Residential Buildings: Civil,
Electro-mechanical and Finishing Works |
Abu Dhabi |
Mr. Khaled Al Oteiba |
1983 |
|
Khaldyah Villas Compound:
Civil, Electro-mechanical & Finishing Works |
Abu Dhabi |
H.E. Sheikh Saif Bin Mohamed
Al Nehyan |
1983 |
|
3 Mosque: Jemaa Masjed 1200
worshipers, Amm 1A Masjed 300 worshipers and Amm 1B Masjed 300 worshipers;
Civil, Electro-mechanical and Finishing Works |
Ruwais - Abu Dhabi |
ADNOC |
1983 |
|
Residential Compound: 57 Villas,
all Civil, Electro-mechanical and Finishing Works |
Al Khalidia - Abu Dhabi |
H.E. Sheikh Saif Bin Mohamed
Al Nehyan |
1983 |
|
Green Bird Buildings: Civil,
Electro-mechanical and Finishing Works |
Abu Dhabi |
Mr. Joan Al Maxroyi |
1984 |
|
Residential Buildings: 9 storey
building, Civil, Electro-mechanical and Finishing Works |
Abu Dhabi |
Mr. Hareb Al Darmaki |
1985 |
|
Al Oteiba Office Tower: Commercial
tower all works; Civil, Electro-mechanical and Finishing Works |
Abu Dhabi |
Mr. Khaled Al Oteiba |
1987 |
EC/521/1043 |
Supply and Provisioning Directorates
building and Technical School: All Works, Civil, Architectural, Elect-mechanical
and Road works. |
Sayed military City –
Swaihan – Abu Dhabi. |
G.H.Q. Armed Forces U.A.E |
1988 |
|
Privet Palace: 20,000m²
Civil, Electro-mechanical and Finishing Works with very High Quality |
Maryland USA |
Toufic Simaan |
1988 |
DASA04-01-C-0005 |
Renovation of buildings 210
and 110 |
Camp Al Udeid Doha - Qatar |
U.S.Air Force ARCENT Qatar |
2001 |
F38604-02-D-U0002 |
Modular Facility IDIQ Contract:
31 Ablution Units |
Camp Al Udeid Doha - Qatar |
U.S.Air Force ARCENT Qatar |
2002 |
DASA04-02-C-0001 |
Ablution Units at buildings
410, 414 |
Camp Al Udeid Doha - Qatar |
U.S.Air Force ARCENT Qatar |
2002 |
F38604-02-D-U0002 |
6 Units of Office Trailer
Buildings |
Camp Al Udeid Doha - Qatar |
U.S.Air Force ARCENT Qatar |
2002 |
DASA04-02-P0044 |
Construct Parking Lot 60.0
m x 90.0 m |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-C-007 |
Renovation of buildings 303,
302, 300 |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-C-008 |
872 Living Containers |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P-0027 |
Interior Works Bldg. 302:
Warehouse creation & Fire System. Renovation |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-C-0022 |
Interior Works Bldg. 215,
217: Offices creation & General Renovation |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DABM09-03-C-0003 |
Interior Works Bldg. Adm.
Area 9000: Creation High Security
Communication Floor |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002-2003 |
DASA-04-02-P-0129 |
Frequency Converter |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P-0133 |
Security Fencing |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-D-0002-0003 |
Misc. Gravel Project |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-D-0002-0004 |
Misc. Gravel Project |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P0025 |
Supplied 31,000 pounds of
special type III concrete |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P0033 |
Supplied 300,000 pounds of
special type III concrete |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P0041 |
Supplied 250,000 pounds of
special type III concrete and 61,600 pounds of Matrix |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P-0042 |
Canvas Tents: Supply of 4
(25x11 m) Canvas Waterproof Tents with Interior Lighting, Air Conditioning
and 2 Generators |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-P-0055 |
Transformer: Supply of 1250
KVA, 11,000 volt Transformer with HV Ring Main Unit |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DASA04-02-C-0039 |
New Light Vehicle Wash Rack |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2002 |
DABM09-03-C-007 |
Latrine Buildings 414 &
410 |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-P-0059 |
Security Fencing at Building
210 |
Camp AS Sayliyah Doha - Qatar
|
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-P-0090 |
Cable Tray Addition |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-P-0088 |
Concrete Pad |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DAMB09-03-P-0022 |
Supplied shipping containers |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-P-0061 |
Security Fencing: Supply &
Installation of Fencing @ misc. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-C-0021 |
Activity Center: Multi Purpose
Hall 703m² 1 floor Steel Structure Building |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-C-0016 |
Troop Medical Clinic: Multi
Purpose Hall 400m² 1 floor Steel Structure Building |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DABM09-03-C-0017 |
Laundry, Latrines & Offices:
12 Steel structure Containers |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2003 |
DASA04-02-D-0002-0006 |
Misc. Paving II |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0007 |
Misc. Paving for Bldg 213
Apron Extension |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0010 |
Concrete Walkways Beside Maintenance
Area |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0012 |
Asphalt Parking near Activity
Center |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0013 |
Asphalt Parking 100 Area |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0015 |
2000 meters of sidewalk ways |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
DASA04-02-D-0002-0016 |
Parking Area 200 |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2004 |
4BOSQA-0111 |
Building 410: Installing a
Temporary Water Line. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0124 |
Building 406, 106 and 109:
Painting the interior wall 4102m² with aluminum Corner Angles. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0132 |
SOCCENT Area Potable Water
Upgrade: Excavating 525m of trench and installing Water Lines and connecting
them to the buildings. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0143 |
Supplying of Two Flag Poles
with 10 Flags for Weather Control. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0144 |
Supplying and Installing 6
2.5 ton Split units with Concrete Pads. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0154 |
Excavating 300m Trench and
installing 8” HP PVC Fire Hydrant Line with One Fire Hydrant
Valve. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0155 |
Street Light: Excavating 1100m
Trench and installing 37 Street Light Posts. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0163 |
Building 208: Constructing
Two Concrete Pads and Two Sunshades and Shifting 7 Freezer with electrical
Connections. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0197 |
Constructing 5000m of Jogging
Trail with Grading and Supplying Sub-base and Compacting. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0206 |
SOCCENT Area: Painting 4 building
Exterior Walls 315m². |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0213 |
Gate 9 and 9a: Constructing
and Installing Two Turn Style Doors and Two Entry Doors with Access
Push Button. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
4BOSQA-0220 |
Building 407: Constructing
a Concrete Pad 16 x 15.2m with Epoxy Paint. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2004 |
5BOSQA-0029 |
Gate 1: Constructing 3 Camera
Sunshades installed on Concrete Barriers. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0042 |
Power Plant: Sand Blasting
and Heat Resistant Painting for Six Generator Stack, Shades, X-changers
and Fuel Tanks. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0097 |
MVACIS Road: Constructing
78m long x 9m wide concrete Road and Steel Structural Sign Board. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0098 |
Power Plant: Supplying and
installing One new Sump Pump. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0143 |
Excavating 750m Trench and
Burying the existing Cable and Filling. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0175 |
Gate 9: Constructing a Steel
Heavy Duty Rolling Door. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0213 |
Constructing 3 each 5.66x5.66m
Concrete Pad and Constructing Steel Sunshade on each Pad. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
|
Hamad Hospital : Painting
Epoxy Parking area |
Qatar |
HBK Contracting |
2004 |
|
8 Villa Compound : Fabrication
and Installation of Wood Doors |
Qatar |
Samerland Cont. |
2004 |
|
8 Villa Compound : Fabrication
and Installation of Wood Skirting |
Qatar |
Samerland Cont. |
2004 |
|
HAWA BEIRUT Restaurant: Wood
Decoration |
Qatar |
Al Khayarin Company Ltd. |
2004 |
|
4Pre-Fabricated Offices: Fabrication
of 4x6x2.43mm Office Trailers |
Qatar |
Raytheon-Posco |
2004 |
|
4 Villa Compound : Fabrication
and Installation of Wood Doors |
Qatar |
Samerland Cont. |
2005 |
|
4 Villa Compound : Fabrication
and Installation of Wood Skirting |
Qatar |
Samerland Cont. |
2005 |
W27P4B-05-R-0007 |
Dog Kennels: Design and Construct
new 34 Dog Kennels building |
International Zone, Baghdad
- Iraq |
U.S.Army MNFI Baghdad Contracting
Office |
2005 |
4BOSQA-0196 |
Fire Department : 4 Porta
Cabins with Furniture |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
|
Vellaggio : Sky Effect Painting
– Base Coat |
Qatar |
LE Studio |
2005 |
W27P4B-05-Q-0035 |
Repair Drop Ceiling: Repairing
of Drop Ceiling in Various Buildings |
FOB, Cuervo Rustamaya- Iraq |
U.S.Army MNFI Baghdad |
2005 |
5BOSQA-0201 |
Building 412: Electrical upgrades |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
4BOSQA-0197 |
Block Power Survey: Surveying
the electrical Cables under ground and buildings and Transformers panel
Labeling |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0239 |
Building 9016 Oasis : Extra
Lights and Fire upgrades and Kitchen Hood with Fire Suppression system |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0240 |
Lift Arm Gate: Installation
of Lift Arm Gate in Camp AS Sayliyah |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0246 |
Relocate AMC AC Unit: Relocating
AC unit with new Duct with electrical connection |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0302 |
Sunshades JLSC: 3 Fabric Mesh
Sunshades in different Locations |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0320 |
Power Plant: Constructing
Side walkway, 3 new External Steel Doors and Interior Painting. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0329 |
Building 111: Constructing
new Drywalls and 3 new Wood doors. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0331 |
Building 124: Constructing
one new Drywall with new Steel Door |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0339 |
Maintenance Shed: Fabricating
and Installing 15.2mx7m Steel Sunshade |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA0326 |
Building 101: Roof Repairs
and Spraying Polyurethane Foam and Waterproof Paint. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA0351 |
Building 303: Constructing
Side walkway, Sunshade and concrete Pad, New bathroom with Cubicle partitions. |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA0295 |
TMP Building: 40ft x 22ft
Port a Cabin with partition and AC and a Bathroom |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA0362 |
Area 100 Ground Maintenance:
Maintenance of grass, trees and platters for one year |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005-2006 |
5BOSQA-0327 |
Building 103: Constructing
Two Kitchen Hood with Fire System and Sewage Repairs |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2005 |
5BOSQA-0350 |
Building 213 : Constructing
a Concrete Pad, Supplying of new ATS 600A and Connecting to Existing
Building, Transformer and Building |
Camp AS Sayliyah Doha |
ITT Industries |
2005 |
5BOSQA-0354 |
Building 111: Roof Repairs
and Spraying Polyurethane Foam and Waterproof Paint |
Camp AS Sayliyah Doha |
ITT Industries |
2005 |
5BOSQA0338 |
Building 200B: Extension of
4 new Dog Kennels and a new room as a Clinic for Dogs all Works (concrete
floor, walls, Painting, Electrical, Plumbing etc…) |
Camp AS Sayliyah Doha |
ITT Industries |
2005 |
5BOSQA0409 |
Building 112: Interior repairs
(Painting, new Carpet, Door Knobs and Smoke Detector). |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0022 |
Building 307 Restroom: Installing
new Drywall, Painting and Tiling. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
5BOSQA0358 |
Building 311 Sunshades: Two
Sunshades 30m x 18m and 21m x 18m with Waterproof Lights and Outlets. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
5BOSQA0361 |
Miniature Golf Course: 9 hole
Golf Course and two water pools all works (excavation, concrete, rubble
walls, artificial grass, flags, street lights, solar lights, and solar
fountains). |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0025 |
Relocate of TMP: Removing
and reinstalling two Roll-up doors, power Ventilator and Light fixture
in new building. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0026 |
PHA Relocation: Installation
of GFE Fence Fabric and two Fence Gates in new location with new Posts
for Fence and Gates. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0040 |
Building 406: Opening passage
way in CMU wall, installing new Dry wall with Paint, relocating existing
door and relocating existing fence. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0035 |
MVACIS Fence: Installing GFM
124m Fence on concrete floor with new Posts for Fence and Gate. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0037 |
Building 406 Lounge: Constructing
12x6m Concrete Pad, Installing GFM Sunshade Installing CMU Wall, Painting
and 3 new Outdoor Lights. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0035 |
Building 208 Electrical Update:
Supply and install 280m 4c x 95mm² Cable underground and New 12
way Panel Boards with new Power outlets. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0081 |
Fencing Stryker Work Area:
Supplying and installing 140m long of 9 gauge PVC coated 7 ft high Fence
with 3 each 9m wide double swing Gates and Leveling the area around
3311m². |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0067 |
North Wall: Removing of 18
street lights and supplying and installing new 23 double sided arm brackets
with new 400W light fixtures |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0077 |
Property Modular Building:
Fabricating steel structure Port a Cabin 40 ft x 22 ft wide with Rollup
door and electrical outlets and supply of Refrigerator and 3 Microwaves |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
W27P4C-M-05-1924 |
Baghdad Repairing Roads: Pouring
of 850m³ Concrete in the holes of the Road |
Camp Victory- Iraq |
U.S.Army Victory Contracting
Office Baghdad |
2006 |
6BOSQA0097 |
Fence Upgrade Area 100: Supple
and Installing 1460m New Aircraft Cable, Tension Wires and Bottom Rails. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0094 |
Building 418 Latrine: Breaking
the outside wall 80m long and building new CMU wall with construction
joints and Tiling, Painting and 4 new single steel doors and 1 new double
steel door. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0114 |
Building 207 Fire Safety Wall:
Constructing a 14.3m Long x 5.25m high with a new 3 hour Fireproof Steel
Door and sealing with special fireproof caulks. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0106 |
Building 414 Latrine: Breaking
the outside wall 80m long and building new CMU wall with construction
joints and Tiling, Painting and 4 new single steel doors and 1 new double
steel door. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0104 |
Building 106: Constructing
a new Drywall room with wood door and a new steel door. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
IJO
6053 |
Building 416 Latrine: Breaking
the outside wall 80m long and building new CMU wall with construction
joints and Tiling, Painting and 4 new single steel doors and 1 new double
steel door. |
Camp AS Sayliyah Doha |
Venture Gulf Group |
2006 |
PO
73 |
Building 408 New Latrine:
Supply and installation of Electrical, HVAC and Plumbing works with
Fixtures. |
Camp AS Sayliyah Doha |
Allied Arms |
2006 |
6BOSQA0153 |
Gate 9A & 9E: Installing
a Transaction Drawer at Gate 9A and Removing and reinstalling Aluminum
Window and two new Flood Lights. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0105 |
Building 410 Latrine: Breaking
parts of the outside wall 80m long and building new CMU wall with construction
joints and Tiling, Painting and 4 new single steel doors and 1 new double
steel door. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0098 |
Driving Range: Fabricating
a Driving Range for Practicing Golf size of 118’ x 42.5’
x 15’ to 35’ high covered with Heavy Duty nets made in
USA with two hexagonal Sunshades, and installing 7 street Lights and
Two 1m Fence Gates. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0076 |
Building 110: Fabricating
and installing 145m 14’ high Fence with two 20’ x 10’
long sliding gate and two 13’ x 14’ high sliding gate,
and purchasing and assembling shelving for Pallet Racks made in USA. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0149 |
Building 110: Constructing
double Stud and Sound Insulated Room with two Wood Doors and a one new
Double Steel Door for SSSC room. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
6BOSQA0167 |
Petrol Station: Removing the
old Steel Roofed Sunshade and Constructing and installing a new Fabric
Sunshade 7.50m x 6.00m. |
Camp AS Sayliyah Doha |
ITT Industries |
2006 |
W912D2-06-C-0019 |
Connex and Concrete Tables:
Fabricating an Office for FedEx with roll-up door, window, AC, Desk,
Chair. Supplying of 12 Concrete Tables and 48 quarter circle concrete
Benches |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2006 |
W912D2-06-P-0090 |
Privacy Slats: Supplying and
Installing 88 meter of Privacy Slats with PVT locks at north side of
building 216. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2006 |
5BOSQA0362 |
Area 100 Ground Maintenance:
Maintenance of grass, trees and platters for one year |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2006-2007 |
6BOSQA0140 |
Building 221: Supplying and
Installing 48 each Low Bay 400 W Ceiling Light Fixtures with wiring
and new 3x30 amp Breaker, 8 each Wall mounted 1500 W Flood Lights with
cable and Photocell and 4 each 10 m high Street Light Poles, 8 each
Sport Flood Lights 1500 W two on each Pole with Cables and new 3x45
amp Breaker. |
Camp AS Sayliyah Doha |
ITT Industries |
2007 |
6BOSQA0152 |
Building 104: Breaking the
wall and making a door way, building new CMU wall and plastering and
Painting Stucco, Installing the GFE Revolving Security Access Door with
all the Electrical, Fire and Data wiring. |
Camp AS Sayliyah Doha |
ITT Industries |
2007 |
W912D2-06-C-0017 |
Modular Processing Building:
40 ft x 22 ft Modular building with very heavy and high quality Steel
Structure with 3 AC Split type units, Electrical, Wood doors, Aluminum
Windows, NIPR and Telephone Outlets connected to a Hub, 7 each Workstation
Furniture with Modular Partitions and 2 Steel Structure Stair Cases. |
Camp AS Sayliyah Doha |
U.S.Army ARCENT Qatar |
2007 |
6BOSQA0148 |
North Area Parking Lot: 4200
meter square of Asphalt Parking, Excavating, providing and filling Sub-base
and Asphalting 90mm Bituminous Asphalt. |
Camp AS Sayliyah Doha |
ITT Industries |
2007 |
W912D2-06-C-0008 |
AFEES Reconfigure: Breaking
walls, Constructing New CMU walls and Dry Walls, supply and install
10 new Steel Doors, supply and install 4 new 25 ton HVAC units with
ducting and diffusers, Removing light and installing in the new location
with new 39 new lights, Tell, Com lines, painting the outside and inside
walls, Epoxy painting the floor, Excavating outside and installing utilities,
Asphalting the front yard and relocating the modular buildings and reconnecting
to the Utilities, Relocating the existing sunshade and fabricating and
installing a new 18 x 12m Sunshade. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-06-P-0149 |
Living Quarters: 2 x 40 ft
x 10 ft Modular building (two living rooms and a bathroom in middle)
with very heavy and high quality Steel Structure with Sandwich Panel
Roof and Wall with 2 AC Window type units, Electrical, Steel doors,
Aluminum Windows, NIPR and Telephone Outlets 2 Steel Structure Stair
Cases. |
Camp Arifjan Kuwait |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0001 |
25th Signal Battalion Parking
Lot: 1270 meter square of Asphalt Parking, Excavating, providing and
filling 100mm high Sub-base and Asphalting 100mm Bituminous Asphalt
of Two Layers |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0002 |
Power to JEOD: Connecting
the Isolator to the GFE Communication Shelter’s Panel, Grounding the
Communication Shelter and the Satellite Base, Supplying and installing
10 each European style 16Amp power Receptacles and installing GFE ECUs. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0003 |
TMC Built : Constructing Four
new Drywall Offices and Closets with Painting and Vinyl Base Molding,
Communication outlets, Smoke Detector, shifting the Sprinkler Heads
and AC Ducts and Shelving in the Closets |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0004 |
DFAC Stair Case : Fabricating
6 each Steel Staircase with Painting |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0005 |
North Parking Lot Sunshade:
Excavating and pouring 18 number of Concrete Foundation and installing
the government provided 2 sunshades. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0006 |
Building 421 Break Room: constructing
a new drywall room with electrical , two aluminum windows, one split
AC. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0007 |
Building 218: Constructing
three new Drywalls, painting and supplying and installing 7 new Steel
Doors. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
W912D2-07-D-0002-0008 |
Sunshade Gate 11: Constructing
new Steel Structural Sunshade size 5790mm x 7315mm x 6000mm high with
excavation and concrete foundation. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
|
Honeywell USA: Excavating
and backfilling trench, concrete foundation for cameras, hiring electricians,
and helpers |
Camp AS Sayliyah Doha - Qatar |
Venture Gulf |
2007 |
|
Scanner Steel Brackets: Fabrication
and Installation Steel brackets |
Camp AS Sayliyah Doha - Qatar |
MEBS |
2007 |
|
Civil works: Excavation and
constructing foundations and installing bollard and posts for camera |
Camp AS Sayliyah Doha - Qatar |
MEBS |
2007 |
|
Equipment: Hiring Boom lifts
and Scissor lifts with operators |
Camp AS Sayliyah Doha - Qatar |
MEBS |
2007 |
|
Manpower: Hiring Electrician,
Labor and Supervisor |
Camp AS Sayliyah Doha - Qatar |
MEBS |
2007 |
W912D2-07-D-0002-0009 |
Helicopter Pad: Excavating
6 holes for lights, engraving the existing concrete pad and painting
reflected paint letter H size of 12m x 10m and supplying 8 each Helicopter
landing lights (imported from USA). |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2007 |
|
10 Excavators Yearly Hire
Contract |
Ras Laffan Industrial City |
CCIC |
2006-2007 |
|
Carrefour III Tiling and Screed
Works |
Landmark Mall |
MAF Hypermarkets |
2007 |
|
Carrefour III Fit out Works |
Landmark Mall |
MAF Hypermarkets |
2007-2008 |
5BOSQA0362 |
Area 100 Ground Maintenance:
Maintenance of grass, trees and platters for Six Months |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2007-2008 |
|
10 Excavators Yearly Hire
Contract |
Ras Laffan Industrial City |
CCIC |
2007-2008 |
W912D2-07-D-0002-0011 |
Steel Sunshade: Fabrication
and installation of 4 Steel Structure and Fabric Sunshades size of each
5m x 4.25m. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0013 |
Combined Marital Quarters:
Combining 2 living containers together with opening 3m wide with wood
frame. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-08-P-0020 |
CCTV Building 213: Installation
only of 8 cameras with all wires and conduits with configuring the system. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
S.029.02.2008-R1 |
Construction Work: Supplying
and Installing Double Block wall with plaster and Paint, One Wood Door
and One Steel Door. |
Al Jazeera Sport Channel –
Studio 4 |
Al Jazeera Channel |
2008 |
W912D2-07-D-0002-0012 |
Security Cage: Fabrication
and installation of Security Cage 16m long with 4mm expansion metal
and frames with one door and supplying and installing one 3m x 4m high
Aluminum rollup door. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0014 |
Water Tower Fence: Supply
and install of 245m long of GI Chain link Fence, 2 x 4.9m Fence Gate
and 1 x .92m Fence Gate |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0015 |
Ablution Unit: Repairing an
existing old Ablution unit with changing the floor, painting the wall,
removing the showers and new sanitary wares and relocating on new constructed
concrete footing with utility connections. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0016 |
Revamping BDOC: Removing existing
Partition, floor carpet, Painting all the walls, supplying and installing
new carpet, electrical NIPR SIPR outlets and shifting the security equipment
from building 102 to Building 101. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0017 |
Repairing existing Rollup
Doors: Supply and install two steel sheet 3.5m x 3m high manual operated
Rollup doors, one Steel insulated 4.4m x 5.6m high and one 4.72 x 4m
high with motor electrically operated Rollup Doors |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
|
Decoration of Showroom Street
45 |
Industrial Area |
Al Daicel |
2008 |
W912D2-07-D-0002-0018 |
Relocating Thermostat: Supply
and install three new thermostat and connect to HVAC units and connect
the HVAC units to FACP |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0019 |
JEOD Temporary Building: Excavation
and constructing 8 concrete Foundation and trench 28m with electrical
Cable and Grounding. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0020 |
IT Tower Relocation: Removing
existing Fence, Generator, Steel Sunshade, Port a cabin and transport
from Tell yard to Camp As Sayliyah; and Dismantle communication Tower
24 meter high and transport and reinstall at Camp Falcon 78. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
|
Excavation of Trench with
Road Crossings |
Ban Hajir, Shaniya, Airport,
Mesieed |
Telvent-Nass |
2007 |
|
CMU Project: Installing of
340m² of Floor Tiles, 3854m² of External Wall Tiles Mechanical
Type and 946m² Gypsum Board Walls |
Qatar Foundation |
CCIC |
2008 |
W912D2-07-D-0002-0021 |
HVAC building 214: Supply
and install one 18ton HVAC unit with Ducting and three Exhaust fans
with Ducting. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0023 |
Server Room: supply and install
5 2.5 ton Split Units. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0025 |
Duct Cleaning: Cleaning the
14 PACU Ducting system and supply and replace 200 flexible ducts. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
|
Installing Tiles: 1160m²
of Stair Steps, 400m² Landing and 400ml Skirting |
SARA TOWER Al Dafna
Area Doha - Qatar |
SEG |
2008 |
|
Installing Tiles: 1608m²
of Floor Tiles, 189ml Skirting, 375m² Stone cladding by mechanical
fixation, 330m² Chiseling and grouting of lift walls and 300m²
of Cladding with Adhesive |
ALI BIN ALI SHOWROOM
Al Dafna Area Doha - Qatar |
SEG |
2008 |
|
Polishing Tiles: 425m²
of Lift wall Tiles and 540ml Grooves + grout |
NAVIGATION TOWER
Al Dafna Area Doha - Qatar |
SEG |
2008 |
|
Grinding and Polishing: 2097m²
Floor Tiles and Skirting |
ALI BIN ALI SHOWROOM
Al Dafna Area Doha - Qatar |
SEG |
2008 |
|
Installing
Tiles: 56m² of Stair landing, 116ml Stair steps, 186ml Curved
stair steps, 150ml Coping Stone, 230m² 10x10cm Circle floor tiles
and 915m² landscaping wall tiles |
ALI BIN ALI SHOWROOM
Al Dafna Area Doha - Qatar |
SEG |
2008 |
W912D2-07-D-0002-0022 |
Dog Kennel Expansion: Fabrication
and installation with concrete foundations of 12x8.4m Port a cabin and
expanding two new dog kennel with block wall and paint and concrete
flooring with electrical and five new split AC units. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0028 |
JTID Antenna Bldg. 303: Constructing
4 footings and installing GFE 15m high Antenna with guy wires &
earth system. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
|
Polishing 2000m² of
Stone Cladding |
AL DAR HOTEL Doha
- Qatar |
Al Mayassa |
2009 |
|
Installing 1600m² Stone
Cladding for Lift Wall and Exterior Wall |
CLASSIC HOTEL
Doha - Qatar |
Al Mayassa |
2009 |
|
Installing Tiles: 3000m²
of Landscaping Tegula, 1500ml of Strips 2x15cm, 500ml of Strips 10x30cm,
1000lm of Strips 15x30cm, 1500ml of Coping 30x30, 770m² of 10x10cm
Circle floor tiles, 500m² Ceramic floor tiles, 650m² Granite water
feature tiles 50x30x30cm, 30x30cm, 45x45cm with polish, sand plaster,
500ml Boundaries Granite tiles 30x30x100cm and 100m² Ceramic Tiles
2x2cm |
ALI BIN ALI SHOWROOM
Al Dafna Area Doha - Qatar |
SEG |
2009 |
W912D2-07-D-0002-0029 |
Replacing Carpet: Removing
the old and installing new carpet 70m² with wood skirting. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0024 |
Guar Booths: Constructing
3 new Concrete slabs and installing 4 GFE Guard Booths with connections. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0026 |
Security Upgrade CMPC: Supply
and install 3 single and 1 double STC 45 Steel Doors with security hardware
and gypsum walls. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2008 |
W912D2-07-D-0002-0030 |
Renovation building 307: Painting
walls, doors, new Vinyl Flooring, Repairing and fixing new False Ceiling,
Repairing and replacing lights, Repairing and replacing toilet tiles,
equipment, Cleaning Carpet, Extending Sprinkler System, and New Exhaust
Fan and Ducting. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0034 |
Gate 10 Guar Shack: One new
Window AC unit and connecting power to the new guard booth. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0031 |
Replacing Lights: removing
and replacing government furnished high bay light fixtures for 6 warehouses
total of 640 lights. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0033 |
MOGAS Fence: Supply and Install
196m Chain Link Fence and 2 new 8.0m Fence Gate |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0043 |
CAC AV Upgrade for Chaplin:
Supply and Install DJ booth made of wood, install GFE projectors and
connections |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0044 |
Building 102 Room 4, Replace
Carpet and AC: Supply and Install 90m² Carpet Tiles and 2 new
Split AC with electrical connections |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0045 |
Working Area for IDS &
CCTV: Supply and Install Wood Shelves and Desk and 1 split AC unit with
electrical connections |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0046 |
Medlog VSAT Installation:
Supply and construct 4.26 x 4.26m concrete pad |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0040 |
Installation of 2 Canopies
in Break Area: Supply, fabricate and Install 2 each 5.5 x 5.5m Sunshades,
including excavation, concrete, etc… |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0041 |
Wash Rack Vacuum: Supply and
Install 2 Vacuum cleaning machines |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0032 |
Add AC Building 107: Supply
and Install a new 20 Top Roof Top PACU with ducting, Steel Structural
supports to carry the Unit and one Split AC unit |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0034 |
DOL Painting: Painting walls,
Doors, Skirting and Stair Rails |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0036 |
CASMAC Fence: Install 231m
Chain Link Fence and 5 new 6.0m Fence Gates |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0037 |
Remove Kevlar: Supply and
Install 90m² Gypsum wall, 2 Aluminum Windows, 2 Wood Doors, 1
Steel Door, 1 Bullet proof Window , 2 interview window, 2 Split Unit,
Lighting, CCTV, and Communication |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0039 |
JPOTF Carpet & Door Installation:
Supply and Install 138m² Carpet Tiles and replace two wood doors with
two new Steel Doors |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
W912D2-07-D-0002-0038 |
JPOTF Fence Mesh: Supply and
Install 966m² mesh over the existing Fence |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2009 |
F38604-09-D-B002-5001 |
PRESCO Sunshade: Supply and
install of 20mx11m PVC membrane Sunshade with concrete pad under it
and supply and install of 12 precast concrete Benches |
Camp AL Udeid Doha - Qatar |
U.S. Air Force |
2009 |
8BOSQA009S |
Area 100 Ground Maintenance:
Maintenance of grass, trees and platters for Six Months |
Camp AS Sayliyah Doha - Qatar |
ITT Industries |
2009 |
|
10 Excavators Yearly Hire
Contract |
Ras Laffan Industrial City |
CCIC |
2009 |
W912D2-07-D-0002-0042 |
Burn Pit: Supply and Install
20m chain link Fence, construct 3220 x 3220 x 150mm and a Burn Pit |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |
W912D2-09-D-0004-0001 |
ADA Blast Wall: Supply and
install 18 Alaska Barriers and filling Soil behind them. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |
F38604-09-C-B004 |
Relocate Sprung Shelter: Dismantle
and reinstall 3 45.7 x 18.4 Steel Structural Sprung Shelter. |
Camp Al Udied Doha - Qatar |
U.S.Air Force |
2010 |
W912D2-09-P-0063 |
AC Units: Supply and deliver
of 23 AC units |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |
W912D2-09-D-0004-0003 |
Main Power Plant: Removing
the existing insulation below the steel Roof and installing a new insulation
with SS mesh. |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |
W912D2-09-D-0004-0005 |
Storage Area: Install new
Drywall, one Wood Door, two small wood Platforms, Painting all walls
and skirting in building 109 |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |
W912D2-09-D-0004-0007 |
Basketball Surface Removal:
Removing of the rubber flooring of Basketball court |
Camp AS Sayliyah Doha - Qatar |
U.S.Army ARCENT Qatar |
2010 |